• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Bagasse based Cogeneration Power Plant
Bagasse based Cogeneration Power Plant

Energy demand is fast increasing with rapid industrialization and urbanization in India. In a developing economy like India, generally energy deman... Read More

Capacity :
10 MW
Plant and Machinery cost:
1423.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
49.00 %
TCI :
3214.00 Lakhs
Cost of Project :
3214.00Lakhs
Add To Inquiry Basket
SUGAR MILL, DISTILLERY AND POWER PLANT
SUGAR MILL, DISTILLERY AND POWER PLANT

India is now the largest producer of sugar in the world. Although subject to cyclical fluctuations, sugar production has grown phenomenally in t... Read More

Capacity :
Sugar Mill Cap. 5000 Crushing/Day,Distillery Cap. 60000 Ltrs/Day, Power Plant Cap. 28 MW
Plant and Machinery cost:
6800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
31.00 %
TCI :
16200.00 Lakhs
Cost of Project :
16200.00Lakhs
Add To Inquiry Basket
Biogas Power Plant from Cow Dung
Biogas Power Plant from Cow Dung

Biogas plants have the ability to accept a wide variety of organic residues as primary fuel input. This includes Cow dung, agricultural residue, ef... Read More

Capacity :
1000 KWh or 1 MWh
Plant and Machinery cost:
485.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
45.00 %
TCI :
1245.00 Lakhs
Cost of Project :
1245.00Lakhs
Add To Inquiry Basket
POWER TRANSFORMER UPTO 40 MVA
POWER TRANSFORMER UPTO 40 MVA

Over the past hundred years transformers have played a major role in the growth of almost all industries in the world. The transformer is a device ... Read More

Capacity :
1 No./day
Plant and Machinery cost:
61.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
30.00 %
TCI :
717.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Solar Photovoltaic System
Solar Photovoltaic System

Solar cell is made from two words, s... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Power Plant
Solar Power Plant

Solar thermal systems for generating electricity use tracking mirrors to reflect and concentrate sunlight on to a receiver, where, it is converted ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
PRE-COMPRESSED PRESSBOARD
PRE-COMPRESSED PRESSBOARD

Pre compressed press board is special type board. It has specialty use in the floor of special electrical instrument like transformer. Specificatio... Read More

Capacity :
300000 Sq. Mt./Annum
Plant and Machinery cost:
61.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
38.00%
Break Even Point (BEP):
53.00 %
TCI :
157.00 Lakhs
Cost of Project :
157.00Lakhs
Add To Inquiry Basket
Power Transformer
Power Transformer

A transformer is a device that transfers electrical energy from one circuit to another through inductively coupled condu... Read More

Capacity :
Power Transformer (132/33 KV, 50 MVA Core Type Oil Cooled) : 50 Nos. /annum
Plant and Machinery cost:
224.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
1043.00Lakhs
Add To Inquiry Basket
Aluminium Bare Conductors
Aluminium Bare Conductors

A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conduc... Read More

Capacity :
• All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day
Plant and Machinery cost:
580.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.36%
Break Even Point (BEP):
56.24 %
TCI :
1141.00 Lakhs
Cost of Project :
1141.00Lakhs
Add To Inquiry Basket
COAL BASED POWER PLANT (500 MW)
COAL BASED POWER PLANT (500 MW)

Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and... Read More

Capacity :
500 MW
Plant and Machinery cost:
143200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.00%
Break Even Point (BEP):
25.00 %
TCI :
158700.00 Lakhs
Cost of Project :
158700.00Lakhs
Add To Inquiry Basket
THERMAL POWER PLANT (5 MW)
THERMAL POWER PLANT (5 MW)

Power generation is an essential requirement of economic growth of a country. Generation involves with the production of power and transmission and... Read More

Capacity :
5 MW
Plant and Machinery cost:
1753.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
29.00 %
TCI :
2076.00 Lakhs
Cost of Project :
2076.00Lakhs
Add To Inquiry Basket
CAPTIVE POWER PLANT
CAPTIVE POWER PLANT

Robust power generation and an effective delivery model determine the bullish economic growth of a country. A weak power infrastructure impedes the... Read More

Capacity :
5 MW
Plant and Machinery cost:
1733.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
34.00 %
TCI :
2097.00 Lakhs
Cost of Project :
2097.00Lakhs
Add To Inquiry Basket
CO-GENERATION POWER PLANT BASED ON BAGASSE
CO-GENERATION POWER PLANT BASED ON BAGASSE

Co-generation plant based on Bagasse is the need of the hour in the perspective of the power generation required and its demand is increasing consi... Read More

Capacity :
15 MW
Plant and Machinery cost:
850.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
46.00 %
TCI :
1746.00 Lakhs
Cost of Project :
1746.00Lakhs
Add To Inquiry Basket
GOOD OPPORTUNITY IN SOLAR POWER PLANT
GOOD OPPORTUNITY IN SOLAR POWER PLANT

In case of Photovoltaic or direct conversion of sunlight to electricity via solar cell, the efficiencies limited to about 20 percent of the absorbe... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Diesel Generating Sets
Diesel Generating Sets
Looking at the huge shortage of electricity supply in the country and at the same time, emphatic need for industrialisations, it can be well understo... Read More
Capacity :
600 Nos. /Annum
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
66.00 %
TCI :
290.00 Lakhs
Cost of Project :
290.00Lakhs
Add To Inquiry Basket
Power Project For Glass Industry
Power Project For Glass Industry

Glass industry in India is one of the prime industry where much more power is utilizing for controlling the production of glass continuously. It is... Read More

Capacity :
110 MW/Day
Plant and Machinery cost:
453.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.00%
Break Even Point (BEP):
52.00 %
TCI :
494.00 Lakhs
Cost of Project :
494.00Lakhs
Add To Inquiry Basket
Wind Mill
Wind Mill

Non-conventional and renewable sources of energy have come to assume tremendous significance both as alternative or substitute and also as viable s... Read More

Capacity :
30 Nos./Day
Plant and Machinery cost:
17.00 Lakhs
Working Capital :
86.00
Rate of Return (ROR):
52.70%
Break Even Point (BEP):
40.81 %
TCI :
137.00 Lakhs
Cost of Project :
137.00Lakhs
Add To Inquiry Basket
Power Generation from Garbage
Power Generation from Garbage

Managing waste is the collection and ultimate disposal of the waste without causing environmental damage. Power generation from waste is one of uni... Read More

Capacity :
5 MW
Plant and Machinery cost:
1940.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
40.00 %
TCI :
3231.00 Lakhs
Cost of Project :
3231.00Lakhs
Add To Inquiry Basket
SUGAR PLANT WITH CO-GENERATION POWER PLANT AND GREEN FIELD SUGARCANE CULTIVATION
SUGAR PLANT WITH CO-GENERATION POWER PLANT AND GREEN FIELD SUGARCANE CULTIVATION

Sugar Industry is one of the most important agro-based industries and is highly responsible for creating significant impact on rural economy in par... Read More

Capacity :
Plant and Machinery cost:
37613.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
44.00 %
TCI :
62600.00 Lakhs
Cost of Project :
62600.00Lakhs
Add To Inquiry Basket
GAS BASED POWER PLANT
GAS BASED POWER PLANT

Electricity is an essential requirement for all facets of our life. It has been recognized as a basic human need. It is a critical infrastructure o... Read More

Capacity :
1014 MWh
Plant and Machinery cost:
437000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
24.00 %
TCI :
467200.00 Lakhs
Cost of Project :
467200.00Lakhs
Add To Inquiry Basket
GAS BASED POWER PLANT
GAS BASED POWER PLANT

When the gas turbine generator was introduced to the power generation industry in the late 1940s, it was a revolutionary self-contained fossil-fuel... Read More

Capacity :
25 MW
Plant and Machinery cost:
10000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
20.00 %
TCI :
11000.00 Lakhs
Cost of Project :
11000.00Lakhs
Add To Inquiry Basket
Captive Power Plant (5MW)
Captive Power Plant (5MW)

Resulting from manufacturing industry’s rapid growth, India is facing severe power shortages. ... Read More

Capacity :
5 MW
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
38.00 %
TCI :
2200.00 Lakhs
Cost of Project :
2200.00Lakhs
Add To Inquiry Basket
Lead Acid Maintenance Free Battery
Lead Acid Maintenance Free Battery

-

Read More
Capacity :
834 Nos./day
Plant and Machinery cost:
66.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
30.00 %
TCI :
1179.00 Lakhs
Cost of Project :
1179.00Lakhs
Add To Inquiry Basket
Transmission Tower & Tele Communication Tower with Galvanizing Plant
Transmission Tower & Tele Communication Tower with Galvanizing Plant

The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above... Read More

Capacity :
24,000 MT /Year
Plant and Machinery cost:
149.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
53.00 %
TCI :
716.00 Lakhs
Cost of Project :
716.00Lakhs
Add To Inquiry Basket
DAIRY FARMING WITH POWER PLANT BASED ON DUNG
DAIRY FARMING WITH POWER PLANT BASED ON DUNG

Read More

Capacity :
27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
32.00 %
TCI :
2500.00 Lakhs
Cost of Project :
2500.00Lakhs
Add To Inquiry Basket
Power Cable
Power Cable

Electrical power cables used for transmission and distribution purposes consist of conductors stranded from plain high conductively annealed copper... Read More

Capacity :
2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
305.00 Lakhs
Cost of Project :
305.00Lakhs
Add To Inquiry Basket
Solar Pump
Solar Pump

The energy consumption per capita throughout the world is rapidly increasing. Solar energy is considered to be unlimited source of energy. Energy i... Read More

Capacity :
12 Nos. / day
Plant and Machinery cost:
17.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
28.00 %
TCI :
288.00 Lakhs
Cost of Project :
288.00Lakhs
Add To Inquiry Basket
Transistor and Semiconductor
Transistor and Semiconductor

The transistor is a semiconductor device which transfers a weak signal from low resistance circuit to high resistance circuit. The words Trans mean... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Power Transformer
Power Transformer

A transformer is a device that transfers electrical energy from one circuit to another through inductively ... Read More

Capacity :
Power Transformers (132/33 KV, 10000 KVA Core Type Oil Cooled) :100 Nos/
Plant and Machinery cost:
85.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
169.00Lakhs
Add To Inquiry Basket
Solar Power Plant
Solar Power Plant

Renewable energy in India comes under the purview of the Ministry of New and Renewable Energy. India was the first country in the world to set up a... Read More

Capacity :
Solar Power 10 MW: 60,000 KWH/ Day
Plant and Machinery cost:
5512.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
5.68%
Break Even Point (BEP):
53.14 %
TCI :
8447.00 Lakhs
Cost of Project :
8447.00Lakhs
Add To Inquiry Basket
PSC Electric Poles
PSC Electric Poles

PSC stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These pole... Read More

Capacity :
60000 Nos. / Annum
Plant and Machinery cost:
126.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
52.00 %
TCI :
415.00 Lakhs
Cost of Project :
415.00Lakhs
Add To Inquiry Basket
GOOD FUTURE PROSPECTS FOR SOLAR THERMAL POWER PLANT
GOOD FUTURE PROSPECTS FOR SOLAR THERMAL POWER PLANT

The growing industrialization and associated use of energy have led the world to face energy crisis which is gaining serious concern day by day. In... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
SOLAR PHOTOVOLTAIC POWER PLANT
SOLAR PHOTOVOLTAIC POWER PLANT

The growing industrialization and as... Read More

Capacity :
1 MW
Plant and Machinery cost:
1435.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
11.00%
Break Even Point (BEP):
93.00 %
TCI :
1871.00 Lakhs
Cost of Project :
1871.00Lakhs
Add To Inquiry Basket
BIOMASS GASIFICATION POWER PLANT
BIOMASS GASIFICATION POWER PLANT

Bio-gas power plant is one of the sources of non-conventional energy. The biomass fuels are solid carbonaceous materials derived from living plants... Read More

Capacity :
1000 KWh or 1 MW.
Plant and Machinery cost:
475.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
66.00 %
TCI :
691.00 Lakhs
Cost of Project :
691.00Lakhs
Add To Inquiry Basket
Maintenance Free Rechargeable Battery
Maintenance Free Rechargeable Battery

Although the lead acid cell was developed by B. Gaston in 1860, it was not until much later when it was adopted by the automobile industry in term ... Read More

Capacity :
834 Nos./day
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
30.00 %
TCI :
1179.00 Lakhs
Cost of Project :
1179.00Lakhs
Add To Inquiry Basket
Inverters 50Hz 100 to 1000 KVA
Inverters 50Hz 100 to 1000 KVA

Inverter is a circuit which converts the D.C. input voltage to an A.C. voltage of specified limit. As soon as electrical technology got developed i... Read More

Capacity :
80 Nos./day
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
55.00%
Break Even Point (BEP):
20.00 %
TCI :
1030.00 Lakhs
Cost of Project :
1030.00Lakhs
Add To Inquiry Basket
Distribution Transformers
Distribution Transformers

The manufacturing process of distribution transformers are quite similar to the process of power transformers. It consist of laminating cores, enam... Read More

Capacity :
1 Nos./Day
Plant and Machinery cost:
40.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
42.00 %
TCI :
209.00 Lakhs
Cost of Project :
209.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Bagasse based Cogeneratio... 10 MW 0.00 3214.00
SUGAR MILL, DISTILLERY AN... Sugar Mill Cap. 5000 Crushing/Day,Distillery Cap. 60000 Ltrs/Day, Power Plant Cap. 28 MW 48.00 16200.00
Biogas Power Plant from C... 1000 KWh or 1 MWh 22.00 1245.00
POWER TRANSFORMER UPTO 40... 1 No./day 52.00 717.00
Solar Photovoltaic System 0 0.00 0.00
Solar Power Plant 0 0.00 0.00
PRE-COMPRESSED PRESSBOARD 300000 Sq. Mt./Annum 38.00 157.00
Power Transformer Power Transformer (132/33 KV, 50 MVA Core Type Oil Cooled) : 50 Nos. /annum 29.00 1043.00
Aluminium Bare Conductors • All Aluminium Alloy Conductor: 10 MT/Day, Aluminium Conductor Steel Reinforced : 10 MT/Day 27.36 1141.00
COAL BASED POWER PLANT (5... 500 MW 56.00 158700.00
THERMAL POWER PLANT (5 MW... 5 MW 52.00 2076.00
CAPTIVE POWER PLANT 5 MW 33.00 2097.00
CO-GENERATION POWER PLANT... 15 MW 53.00 1746.00
GOOD OPPORTUNITY IN SOLAR... 0 0.00 0.00
Diesel Generating Sets 600 Nos. /Annum 41.00 290.00
Power Project For Glass I... 110 MW/Day 56.00 494.00
Wind Mill 30 Nos./Day 52.70 137.00
Power Generation from Gar... 5 MW 36.00 3231.00
SUGAR PLANT WITH CO-GENER... 32.00 62600.00
GAS BASED POWER PLANT 1014 MWh 48.00 467200.00
GAS BASED POWER PLANT 25 MW 44.00 11000.00
Captive Power Plant (5MW) 5 MW 0.00 2200.00
Lead Acid Maintenance Fre... 834 Nos./day 52.00 1179.00
Transmission Tower & Tele... 24,000 MT /Year 46.00 716.00
DAIRY FARMING WITH POWER ... 27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung 43.00 2500.00
Power Cable 2050 MT Aluminium Power Cable/Annum 350 MT Copper Power Cable/Annum 45.00 305.00
Solar Pump 12 Nos. / day 47.00 288.00
Transistor and Semiconduc... 0 0.00 0.00
Power Transformer Power Transformers (132/33 KV, 10000 KVA Core Type Oil Cooled) :100 Nos/ 27.00 169.00
Solar Power Plant Solar Power 10 MW: 60,000 KWH/ Day 5.68 8447.00
12

Showing 37 Product(s)

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.